Master Bathroom Remodel for Sue & Bob Klein of Naperville, IL

January 3, 2014

We began a complete tear out only leaving the bathtub and the drywall. We also have removed the pine doors from the internal bathroom walkin closets and the main bathroom pine door for future installation of oak doors with new oak casing, baseboard, and crown molding. This is the progres of day 1 after the tear out and clean up.

 

Naperville, IL Bathroom Remodeling - JW Construction & Design ServicesChicago bathroom remodel before pics - JW Construction & Design Services

Day 2

Today we installed all the rough electrical for the new design and bathroom layout including the warm wire to heat the future tiled floor and we also installed the pro-level over the warm wire at the end of the day before we left to make sure the floor was 100% level and all the warm wire was embedded 100% within the pro-level.

Heated Bathroom Floors Installation in Chicago - JW Construction & Design Services

Day 3

We roughed in the plumbing for the shower, durock-ed shower walls and bath tub area and began the main floor tile installation. 

 

Day 4,

We continued the tile installation on the main floor and grouted and poured the shower base floor for future tile that will be installed on the shower floor.

 

Day 5, 6 & 7

We continued to tile and grout the tub area and the shower. We installed custom cabinetry provided by Stonebridge designs and installed granite on the cabinets along with the center tower on top of the granite countertop. We drilled the holed for the vessel sinks and single faucet installations along with installing the vessels and the faucets. We installed the mirrors and wall sconces above the mirrors. we also installed the new plumbing fixtures on the bathtub and shower along with installing the toilet.

 

Naperville Bathroom Remodel in Progress - JW Construction & Design services

 

 

Chicago Bathroom Remodel in Progress - JW Construction & Design Services

Day 10

we patched, primed and painted the ceiling and walls along with staining all the new oak doors, basebpoard, casing, and shoe and polyurethane. 

Basketweave Tile Installation in Naperville - JW Construction & Design Services

 

Bathroom Remodeling in Naperville - JW Construction & Design Services

 

Day 12

We introduced the kleins to their new master suite and they are already talking about their other two bathrooms. once we are done replacing their roof this summer. 

 

Shower Tile Installation Chicago - JW Construction & Design Services

 

Granite Open Bench in Naperville Shower - JW Construction & Design Services

 

Vanity with Vessel Sink in a Chicago Bathroom - JW Construction & Design Services

 

Shower Tile Installation Chicago - JW Construction & Design Services

Sewer Line Repair in Naperville, IL Amazing Kitchen Transformation - from 1990 to 2015! A Wow Backyard Patio for Naperville Homeowners Beautiful Master Bath Remodel in Naperville, IL Complete Home Remodeling in Naperville, IL Master Bathroom Suite Remodel in Naperville, IL Cold Weather Plumbing Tips - From Your Expert Plumber Master Bathroom Remodel in Downers Grove, IL Gorgeous Slate-Like Floor Tile Install Spa Bathroom in Naperville, IL (Beautiful 'After' Pics!) Master Bathroom Remodel in Darien, IL A New Bathroom for a Soon-to-be-Wedded Couple! A Bath Sanctuary for a Naperville, IL Couple Master Bathroom Update in Aurora, IL with Heated Floors & Beautiful Jinshan Bone Travertine (Stunning Completed Pics) Striking Noir Travertine Hall Bathroom Remodel for Existing Clients JW Referred for Bathroom Remodel by Happy Clients JW Delivers Peace of Mind to Homeowners in Lombard, IL Basement Renovation Project in Naperville, IL (Beautiful Basement Overhaul Pics) Master Bathroom Design & Remodeling in Naperville, IL (stunning transformation pics) Fireplace Tile Installation in Naperville, Il Full Basement Remodeling Project in Naperville, IL Heated Floor Install in a Slate & Stone Bath in Aurora, IL Accessible Bathroom Remodel in Geneva, IL Kitchen, Foyer, & Powder Room Remodel (Silver Travertine Completed Pics) Sowa Kitchen Remodel in Naperville, IL Zimmerman Kitchen Remodel in Naperville, IL (Beautiful Transformation Pics) Bathroom Remodeling in Naperville, IL (Dramatic Transformation - Click to View Completed Pics) Cralos Silver Travertine Bathroom Remodel in Lisle, IL (Completed Pics to Come Soon!) Master Bathroom Shower Remodel in Naperville, IL (Completed - Gorgeous Finished Pics!) Slate & Stone Aurora Bathroom Remodel (Completed) Stonebridge Design's Kitchen Remodel (Completed Pics to Come Soon)! DelGrosso Kitchen Remodel in Naperville, IL (Completed - Click for Pics!) Master Bathroom Remodel in Darien, IL (Completed) Master Bathroom Remodel Fix-Up in Aurora, IL (Completed) White Eagle Master Bathroom in Naperville, IL (Completed) JW Takes Over a Bad Contractor Bathroom Remodel in Aurora, IL The Zimmerman Master Bath Project in Naperville (Completed) New Look Construction Project in West Chicago (Completed)
Latest Blogs (Click to View)
Welcome to JW Construction & Design's Home Remodeling Blog. View our latest project blogs
to be inspired, see before-after pictures, and follow the inner-workings of exciting home
remodeling projects.

JW Construction
& Design Services
     
630.453.3769
RSS Feed

Browse Blogs By Date

© JW Construction & Design, 2012
   



Fax Number 1-630-375-8368
Phone Number 1-630-453-3769
8821 Ramm Dr., Suite5
Naperville, IL 60564

Aurora  Bolingbrook  Clarendon Hills  Darien  Downers Grove  Geneva  Glen Ellyn  Lisle  Lombard  Montgomery  Oakbrook  Oakbrook Terrace  Oswego  West Chicago  Wheaton  Willowbrook  Westmont  Chicago  Glencoe  Highland Park  Winnetka